Wednesday, February 25, 2015

Living Room and a Sad Tree

We finished up painting the living room (other than the window sashes) and it looks really nice. I am glad we decided not to try to smooth out the walls as I don't mind the imperfections at all. Before we move in, we want to get the bedroom upstairs done too (in Prussian Blue) so we got the first white coat on the trim.



It looks much lighter blue in natural light. These were taken at night.

I keep going back and forth about the huge oak tree out front. I want to save it but it is having a rough going of some damage which occurred a couple of years back and all the experts agree it is structurally weakened to the point of needing to come down. It is by far the tallest tree anywhere near here and has probably been around at least a hundred and fifty years. If it goes it will be a sad day...


Thursday, February 12, 2015

New Paint in the Living Room

Here's an update on the progress in the living room! The brown and beige walls are gone, replaced with a navy blue (Benjamin Moore Washington Blue) and crisp white (Benjamin Moore Harwood Putty). I'm pleased with the result thus far, but need to go over the ceiling again and touch up walls.


The wall colors are both from the Benjamin Moore Williamsburg Collection:
Washington Blue and Harwood Putty

I was going for a bit more natural light with the door open, but it didn't work out as well as I'd hoped. You still get the gist. 

Don't worry, I'm going to replace or paint that vent grating. I'm also going to do another coat on the wall since the wooden wall didn't take the paint quite as well as the plaster walls. 

Thursday, February 5, 2015

Progress in the Bathroom and Living Room

   Matt and Justin rushed out to help get the bathroom underway and it is very appreciated. Matt spent the first day in cold wet sand under the house pulling all the jury rigged plumbing that had been done in the past and it was decided that the rotten joist had to come out.


  So we started the next day at Lowes to get lumber and all the plumbing we could think of to get it stubbed out. You would be surprised what a handful of brass fixtures costs you (even when installing PEX).
For those that know me, they understand the need for Mountain Dew when undertaking any serious work.

   After getting the old joist out and the new one in we were hoping to start plumbing but realized there was another joist under there which wasn't really even attached to the house but we hadn't planned on this and couldn't make it back and forth to Lowes so we called it a day. We actually got a lot of the planning and structural work done even if you wouldn't notice it looking at it.

The new joist is a pair of pressure treated 2x8s.

   Before Matt got there, I put a second coat on some of the trim in the Living Room. Jen has done a great job in there so far and I think it looks awesome. So much better than the off beige trim that was in here before.



We still need to paint the window sashes and the ceiling itself.

Please ignore the man in the mirror...

Matt seems to think the imperfections in the wall plaster just give the house character so in general we will leave it alone. 

Sunday, February 1, 2015

First Day at the House

    Today is the first day the house is ours and we got right to work. Jen is painting the trim in the living room (Harwood Putty) and I am starting work on the bathroom. For those who haven't seen the bathroom here it is.

     That horrible fiberglass walled shower is the only bath in the main house and it doubled as the washing machine location! We are replacing it with an old cast iron clawfoot tub that is a bit more appropriate (though originally there were no bathrooms in the house of course). So I removed all of the water fixtures in the room starting with the shower. It turns out that the shower pan was leaking and destroyed both the 1/4" plywood underneath and the original pine floor under that. 


     That is going to have to come up and be replaced with something able to support the weight of a full cast iron tub. The 1/4" ply over pine is not stable enough for tile in any case so I removed the two layers of linoleum and the plywood. Not bad for a days work...




Tuesday, December 30, 2014

And so it begins...



  The purpose of this blog is to document the happenings at the O'Neill House. I am sure anyone who is looking at this is family or friends so I won't go through who we are since y'all know. We haven't signed the papers yet so it isn't officially ours yet. The house needs a bit of work before we can comfortably live there.
   The most pressing issue is that the only full bathroom in the house happens to be a small room containing the water heater, washer, dryer, toilet, sink, and a tiny stall shower. Our first goal is to make this into a functioning bathroom. Having been added to the house, the bathroom has a panel ceiling where the rest of the house is beadboard and linoleum where the rest of the house is heart pine. The plan is to create a laundry closet, tile the floors, beadboard the ceiling, and replace the stall shower with a clawfoot tub with shower.
  Once the bathroom is done, it seems the kitchen needs some work as the low budget counters and cabinets and peeling lino tiles are just not going to cut it. We are thinking hardwood to match the rest of the house with butcher block counters on reworked cabinets should turn this tiny kitchen into liveable space.

Today, I finished pulling the nails on about a thousand feet of beadboard salvaged from a circa 1900 house being taken down to studs. It wasn't a neat pull so most of the boards need some work (grooves being damaged) and sanding and priming but for $100 it still seems like a deal for real, vintage beadboard.